]> git.uio.no Git - u/mrichter/AliRoot.git/blob - HIJING/hijing1_36/atrobo.F
Stand-alone library for ESD. Possibility to use only root and lidESD.so for analysis...
[u/mrichter/AliRoot.git] / HIJING / hijing1_36 / atrobo.F
1 * $Id$
2
3
4 C
5 C*******************************************************************
6 C       make  boost and rotation to entries from IMIN to IMAX
7 C*******************************************************************
8         SUBROUTINE ATROBO(THE,PHI,BEX,BEY,BEZ,IMIN,IMAX,IERROR)
9 #include "lujets_hijing.inc"
10         DIMENSION ROT(3,3),PV(3)
11         DOUBLE PRECISION DP(4),DBEX,DBEY,DBEZ,DGA,DGA2,DBEP,DGABEP
12         SAVE
13         IERROR=0
14      
15         IF(IMIN.LE.0 .OR. IMAX.GT.N .OR. IMIN.GT.IMAX) RETURN
16
17         IF(THE**2+PHI**2.GT.1E-20) THEN
18 C...ROTATE (TYPICALLY FROM Z AXIS TO DIRECTION THETA,PHI)
19            ROT(1,1)=COS(THE)*COS(PHI)
20            ROT(1,2)=-SIN(PHI)
21            ROT(1,3)=SIN(THE)*COS(PHI)
22            ROT(2,1)=COS(THE)*SIN(PHI)
23            ROT(2,2)=COS(PHI)
24            ROT(2,3)=SIN(THE)*SIN(PHI)
25            ROT(3,1)=-SIN(THE)
26            ROT(3,2)=0.
27            ROT(3,3)=COS(THE)
28            DO 120 I=IMIN,IMAX
29 C**************    IF(MOD(K(I,1)/10000,10).GE.6) GOTO 120
30               DO 100 J=1,3
31  100             PV(J)=P(I,J)
32                  DO 110 J=1,3
33  110                P(I,J)=ROT(J,1)*PV(1)+ROT(J,2)*PV(2)
34      &                     +ROT(J,3)*PV(3)
35  120             CONTINUE
36         ENDIF
37      
38         IF(BEX**2+BEY**2+BEZ**2.GT.1E-20) THEN
39 C...LORENTZ BOOST (TYPICALLY FROM REST TO MOMENTUM/ENERGY=BETA)
40                 DBEX=BEX
41                 DBEY=BEY
42                 DBEZ=BEZ
43                 DGA2=1D0-DBEX**2-DBEY**2-DBEZ**2
44                 IF(DGA2.LE.0D0) THEN
45                         IERROR=1
46                         RETURN
47                 ENDIF
48                 DGA=1D0/DSQRT(DGA2)
49                 DO 140 I=IMIN,IMAX
50 C*************     IF(MOD(K(I,1)/10000,10).GE.6) GOTO 140
51                    DO 130 J=1,4
52 130                DP(J)=P(I,J)
53                    DBEP=DBEX*DP(1)+DBEY*DP(2)+DBEZ*DP(3)
54                    DGABEP=DGA*(DGA*DBEP/(1D0+DGA)+DP(4))
55                    P(I,1)=DP(1)+DGABEP*DBEX
56                    P(I,2)=DP(2)+DGABEP*DBEY
57                    P(I,3)=DP(3)+DGABEP*DBEZ
58                    P(I,4)=DGA*(DP(4)+DBEP)
59 140             CONTINUE
60         ENDIF
61      
62         RETURN
63         END