Increases transport cuts in the tunnel.
[u/mrichter/AliRoot.git] / STRUCT / AliHALLv3.cxx
2007-04-27 morschIncreases transport cuts in the tunnel.
2007-03-29 morschPoints 2 cavern/pit and shielding blocks as installed.