3 Measurement of targets on FMD1
15 https://edms.cern.ch/document/943928
21 > General Observations:
23 The V0A detector has been installed and first measured on 18.07.2008.
24 Afterwards it has been moved close to final position and measured on
25 25.07.2008. The final alignment of the V0A detector has been done in
26 three iterations (called sessions) on 12.08.2008.
43 Point Name,XPH,YPH,ZPH,Point Type,Target Used,Precision(mm)
47 V0L_ICB 127.73 -220.41 3246.58 M Y 1
48 V0L_ICT 127.37 219.48 3247.24 M Y 1
49 V0L_OCB -126.99 -220.40 3247.27 M Y 1
50 V0L_OCT -126.99 219.51 3247.49 M Y 1